Jiujiang Four Steelmaking


Release time:

2023-09-20

This time, Huashun transformed the Jiujiang Fourth steelmaking 6-machine 6-flow billet continuous caster project, from the second cold chamber, the straightening machine, the roller before and after cutting, the fire cutting machine, and the billet roller, with a total of 534 lubrication points, which were installed and debugged by the after-sales personnel of Huashun oil and gas lubrication system. The installation cycle is 8 days, and the installation and commissioning are completed in a relatively short period of time to meet customer production requirements and achieve smooth steel passing without abnormalities.So far, all four sets of continuous casters in Jiujiang No. 4 Steelmaking Plant have been retrofitted with Huashun oil and gas lubrication system, and all of them have been retrofitted, and the lubrication effect is good and meets the requirements of the steel mill leaders.